Feria del libro importado hasta 50% dcto  VER MÁS

menú

0
  • argentina
  • chile
  • colombia
  • españa
  • méxico
  • perú
  • estados unidos
  • internacional
portada Logistics Support: Controls at Navy's Andros Island Test Range Need Improvement: Nsiad-91-75 (en Inglés)
Formato
Libro Físico
Editorial
Idioma
Inglés
N° páginas
30
Encuadernación
Tapa Blanda
Dimensiones
24.6 x 18.9 x 0.2 cm
Peso
0.07 kg.
ISBN13
9781287229964

Logistics Support: Controls at Navy's Andros Island Test Range Need Improvement: Nsiad-91-75 (en Inglés)

U. S. Government Accountability Office ( (Autor) · Bibliogov · Tapa Blanda

Logistics Support: Controls at Navy's Andros Island Test Range Need Improvement: Nsiad-91-75 (en Inglés) - U. S. Government Accountability Office (

Libro Nuevo

$ 82.153

$ 136.922

Ahorras: $ 54.769

40% descuento
  • Estado: Nuevo
  • Quedan 100+ unidades
Origen: Estados Unidos (Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el Lunes 12 de Agosto y el Miércoles 21 de Agosto.
Lo recibirás en cualquier lugar de Colombia entre 1 y 5 días hábiles luego del envío.

Reseña del libro "Logistics Support: Controls at Navy's Andros Island Test Range Need Improvement: Nsiad-91-75 (en Inglés)"

Pursuant to a congressional request, GAO examined logistics support services at the Navy's Atlantic Undersea Test and Evaluation Center (AUTEC) at Andros Island, Bahamas, and West Palm Beach, Florida, focusing on the: (1) need for certain general purpose equipment; (2) accuracy of property records; (3) adequacy of inventory controls over supplies; (4) adequacy of Navy oversight of contractor logistical support; and (5) merits of cost-reimbursement and fixed-price contracts. GAO found that AUTEC: (1) had excess air and marine craft and land vehicles; (2) kept inaccurate property records for equipment and material and significantly understated plant equipment and overstated material inventory in its annual report; and (3) had inadequate inventory controls to prevent waste and abuse. GAO also found that the Navy: (1) did not properly oversee AUTEC logistics support activities because its assigned property administrator was not fully qualified and appointed; and (2) should consider a fixed-price contract for the logistics support portion of the work to replace the existing cost-plus-award-fee contract, since it generally knew the scope of the required logistics support work.

Opiniones del libro

Ver más opiniones de clientes
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)
  • 0% (0)

Preguntas frecuentes sobre el libro

Todos los libros de nuestro catálogo son Originales.
El libro está escrito en Inglés.
La encuadernación de esta edición es Tapa Blanda.

Preguntas y respuestas sobre el libro

¿Tienes una pregunta sobre el libro? Inicia sesión para poder agregar tu propia pregunta.

Opiniones sobre Buscalibre

Ver más opiniones de clientes