Compartir
Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 2 (en Inglés)
Commission, U. S. Nuclear Regulatory (Autor)
·
Createspace Independent Publishing Platform
· Tapa Blanda
Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 2 (en Inglés) - Commission, U. S. Nuclear Regulatory
$ 160.434
$ 246.821
Ahorras: $ 86.387
Elige la lista en la que quieres agregar tu producto o crea una nueva lista
✓ Producto agregado correctamente a la lista de deseos.
Ir a Mis Listas
Origen: Estados Unidos
(Costos de importación incluídos en el precio)
Se enviará desde nuestra bodega entre el
Viernes 19 de Julio y el
Martes 30 de Julio.
Lo recibirás en cualquier lugar de Colombia entre 1 y 5 días hábiles luego del envío.
Reseña del libro "Final Safety Evaluation Report: Related to the Combined Licenses for Vogtle Electric Generating Plant, Units 3 and 4, Volume 2 (en Inglés)"
The U.S. Nuclear Regulatory Commission (NRC) regulations in Title 10 of the Code of Federal Regulations (10 CFR) Part 52 include requirements for licensing new nuclear power plants.3 These regulations include the NRC's requirements for early site permit (ESP), design certification, and combined license (COL) applications. The ESP process (10 CFR Part 52, Subpart A, "Early Site Permits") is intended to address and resolve siting-related issues. The design certification process (10 CFR Part 52, Subpart B, "Standard Design Certifications") provides a means for a vendor to obtain NRC certification of a particular reactor design. Finally, the COL process (10 CFR Part 52, Subpart C, "Combined Licenses") allows an applicant to seek authorization to construct and operate a new nuclear power plant. A COL may reference an ESP, a certified design, both, or neither. As part of demonstrating that all applicable NRC requirements are met, a COL applicant referencing an ESP or certified design must demonstrate compliance with any requirements not already resolved as part of the referenced ESP or design certification before the NRC issues that COL.